$568k quantum is still considered cheap to manyOriginally Posted by kaizhe
$568k quantum is still considered cheap to manyOriginally Posted by kaizhe
Macly super fast!!!!!
Expected TOP of structure june this year...most likely TOP in Sept...Originally Posted by carbuncle
Can you check the suites@eunos? It is also by macly, the structure on paper should be completed by April...
look at the size.. it is only 344....not 400++ worOriginally Posted by price
Now then you say... already out of the area. But did see it passing by. Already all build finished liao... nice nice and lonely looking by the mrt track hahahah.... thin thin short short flat flat wind blow dunno will fly away not.Originally Posted by kaizhe
ok time to transpass the new condo!!Originally Posted by carbuncle
Must share some insider pics okayyyy!Originally Posted by kaizhe
btw love your avatar.... so freakutiful
Updates in June 2012:
Signboard says June 2012, certainly can't make it.
May be Sep 2012 more likely...
Wah bro. U now the azeoprop of Geylang?
Are you certain about "bro"? Why not "sis"?Originally Posted by TheOnlyGayInTheVillage
Dunno la. Just start off with higher likelihood one lor.Originally Posted by anythingwhatever
Aug 2012: Developer shifted completion date by 2 YEARS to June 2014!!
Originally Posted by anythingwhatever
Goes to show whoever believes in the date on the board is crazy bird....
The buyers of this project may well be "Angry Birds" now...Originally Posted by carbuncle
Think they removed the green "net" covering the building.. is TOP happening soon?
Any idea if the museum besides the project opened? Seems like it is not opened...or in operations.
the museum with a huge hand? tan swee something... check their websiteOriginally Posted by lionlamb10
saw this on straits time today. Think its the same artist whose museum is next to suites@sims. Wow... $3.7m for a painting...
Singapore artist's work sells for $3.7 million
TAN Swie Hian has become the most expensive living artist in Singapore. Last night, a frenzied five-way bid at the Poly Autumn Auction's Modern And Contemporary Chinese Art Evening Sale in Beijing saw Tan's oil and acrylic painting, When The Moon Is Orbed (140cm x 206cm), selling for 18.975 million yuan (S$3.7 million).
hi guys, i am new to this forum... in relation to suite @ sims anyone aware of the TOP period as seemingly delay couple times already...
344sqft...ya facing the back alley...the front facing is just terribleOriginally Posted by mcmlxxvi
Hello Kaizhe you were able to go up & take photos??? Has it TOP or site allows owners to go up?
pardon my questions if they sound silly but i'm very eager to go up & take a look too
what's your opinion of the workmanship, quality etc? i'm curious as to how does it compares to Fragrance (which i was pleasantly surprised with)
uploaded photos of the rooftop pool...
is the 2nd photo a pond?Originally Posted by astroboy8681
the pond makes for human fishes sits 4-5 comfortably indeed...
the jacuzzi makes for a swimmingly good soak but to be honest, was quite disappointed with workmanship & actual unit differs from floor plan shown... like wtf
as some forummers said earlier, the TOP has been delayed indefinitely & owners are probably angry birds now. calls to developers has proven futile...
does anyone knows if owners have a recourse if developer is unable to make good to floor plan??
Looks like Fish Spa area......Originally Posted by astroboy8681
yawns... just checked with dev : Mac(s)ly TOP likely July onwards
Considering their first date given on white board says June 2012
Anyone with vested interests having tinge of regrets buying this project
i sure do now.....
I think Macly also did the project for Thomson V Two which got delayed and the final product is also
if u look at the shop units, pipes n cables are running thru everywhere inside the shops.
Mac(s)ly did V one & V two... clearly the end-product leaves plenty to be desired... (well i heard good reviews for zedge thou)
i have a Q not sure if anyone able to answer : The designated wardrobe as per floor plan was not physically built as power points & heater switch along the wall.
I ask foreman and was told electrician had no other choice and asked if i may choose another wall in the room for them to build the wardrobe (astonished ) this would mean i'm unable to do a TV feature wall in front of bed thus a huge compromise
Do i have the RIGHT to ask Dev make good to floor plan & shift the power point / heater switch to another wall so wardrobe could be built & i won't be compromised
Dunno is it i suay....