Thank you sis eastlover. It must be an exciting adventure for you..
Which entry did you sneak in from?
Thank you sis eastlover. It must be an exciting adventure for you..
Which entry did you sneak in from?
Thank you for the update ?Originally Posted by East Lover
May I know how you go up to your floor? By lift or by walk up to the stair case?
East Lover,
u r the best!! Told my mum ur findings & she was so happy.
Xie xie
Looking fwd to TOP
Hi eastlover, is the boundary wall surrounding the condo made of concrete or mesh wire fence?
haha... do i get a sense that soon, some others are going to try this adventure too? ....
Please be careful for your own safety hor...haha, no matter what, is still a construction site. And dun take the lift even if there's power.
i claim up via the staircase... stack #09
Originally Posted by Justin3Originally Posted by thechoi
the boundary wall from entry to block 79 is concrete wall. the wire fence starts from the reservior facing all the way to the entry.
the concrete wall is purely for car drivng path safy purpose...
Originally Posted by star
thanks! i think i will dare not to try it again liao... actually quite risky in the dark night at contruction site but i felt no fear maybe i was at my home?
WV is very nice project i have to repeat again. you come and feel to appreciate it!
Originally Posted by Shadus
1. Anyone looking for loft bed? Any recommendation?
2. Is it better to wall mount TV or to have a feature wall to mount it?
Featurewall is nice and conceals the wires but takes up precious space and makes the room, which is already small, even smaller. I would go for just wall mount without feature wall. Maybe just paint the wall with deco-artOriginally Posted by athenl
Pool is going to remove today. They started yesterday. Club house is doing now...
Maybe tomorrow east guy can come & take a big shoot for our big-8 pools!
Wow!! Soooo looking forward to see the pools! Wished I can go in n see......Originally Posted by East Lover
You can just put a piece of feature wall that don't take up much space... remembering that feature wall can help to make the room more spacious. Spaciousness is a matter of perception to a certain limitation of courseOriginally Posted by waterviewer88
Sis your network reception very the pow-derful. I shall take a look later in the evening the unveiling of the '8'.Originally Posted by East Lover
My brother also went into his Prive with the help of the workers legally. Hehe. Just buy them some food and all and they went in-a few of them. Just confirmed TOP a few days ago he mentioned so he's as excited as a raccoon.
Þú vissir af mér
‘Eg vissi af þér
Við vissum alltaf að þetta myndi enda
Originally Posted by waterviewer88
Thank you for the advice!
Originally Posted by East Lover
For the benefit of those not in our facebook group, pics from our dear bro EastGuy taken this morning.
Originally Posted by East Lover
Good Job Sister. You must be train before in FIBUA (Fighting In Build Up Area) with our 3G Army. Thanks for your detail report.
Thanks Brother Tay
Thanks for the photos, just manage to retrieve it and the pool is real huge and loves it is in blue thanks brothers and sisters
A case of an average of 696x4 which gives a total of 2784 should each single waterviewer jumps into the pool in a heatwave. Some might hv to settle for the reservoir in a worst case scenario. Haha...
Þú vissir af mér
‘Eg vissi af þér
Við vissum alltaf að þetta myndi enda
that's true :POriginally Posted by desquire
I need to consult Mr Tay again
See the progress of Minton, i think that's the stage of ready for TOP... how long more can we archive that stage? by end of August possible??
http://forums.condosingapore.com/sho...=9308&page=336
The area of the adult pool of 50m diameter is 1964 sqm. Assuming each person takes up 0.5sqm of space, you can fit in 3388 people - more than the whole ave waterview population...and that's not counting the kiddie pool yetOriginally Posted by desquire
hungry eat sleepy sleep
I think a safe bet is end oct.Originally Posted by East Lover
hungry eat sleepy sleep
Hahahha. I like the way you think bro. That's the way Math is supposed to be. More than enough. I wanna be beside all the WV babes... Hahahha... Let's see what happens when the day comes...Originally Posted by acidic.straw
Þú vissir af mér
‘Eg vissi af þér
Við vissum alltaf að þetta myndi enda
Now it's almost certain. Workers there mentioned November. That means they must have been programmed to know that the place will complete by then. Who is more accurate than the workers who work themselves. It's SL target and the workers' duty to meet the deadline.Originally Posted by acidic.straw
So, lets all get ready for Christmas 2013 with the Renovation contractors!!
Þú vissir af mér
‘Eg vissi af þér
Við vissum alltaf að þetta myndi enda
Originally Posted by desquire
Just curious, when you mentioned Nov = meaning TOP? But it might be in batches to release the keys right? Might drag for a few weeks or months?
Months....Originally Posted by athenl
Yup, the front runners will get their keys first. That's what I was told. I'm a rookie in this.Originally Posted by athenl
Þú vissir af mér
‘Eg vissi af þér
Við vissum alltaf að þetta myndi enda
I agree. Still looks like quite a lot of works. Frontage, they are hurting up those planter boxes, still got that water feature which will require some pumps, pipeworks etc. Clubhouse still need quite a bit of works. Last saw some application dated 5 Jul 13 for some structural wworks n status was processing. Some minor works I guess. Btw actual readiness for TOP, application, inspection n hopefully no directions to rectify n actual TOP, reasonable to cater at least 2 wks if not more.Originally Posted by acidic.straw