    The Proposed Erection of 2 Blocks of 19 Storeys Condominium Flat Development (Total 89 Units) with 2 Basement Carparks, Swimming Pool and Communal Facilities On Lots 370X, 371L,372C, 373M, 374W, 375V, 382K, 383N, 384X, 385L, 386C, 387M,488L, 533C, 535W,537P, 539A, 623M, 1409N and 1410A TS 21 At Lengkok Angsa /Paterson Road (River Valley Planning Area)

    Developer/ Owner Bukit Sembawang View Pte Ltd
    Design Architect DP Architects Pte Ltd
    Civil & Structural Engineers KTP Consultants Pte Ltd
    M&E Consultant Engineers J Roger Preston (S) Pte Ltd
    Landscape Consultant Ong & Ong Pte Ltd
    Quantity Surveyors KPK Quantity Surveyors (Singapore) Pte Ltd
    Main Contractor Keong Hong Construction Pte Ltd
    Contract Period 10 Aug 11 - 09 Feb 14
    Duration 30 Months
    Progress Photo - 10 Sept 2011
    http://www.keonghong.com/Projects/Paterson2.aspx

    Last edited by sleek; 30-09-11 at 00:12.
    BE CENTRED BY ALL AT THE FRINGE OF THE CITY @

  2. #2
    teddybear's Avatar
    teddybear is offline Global recession is coming....
    Join Date
    Mar 2009
    Posts
    10,800

    Default

    This one is in D9 lah not D10

    Quote Originally Posted by sleek


    The Proposed Erection of 2 Blocks of 19 Storeys Condominium Flat Development (Total 89 Units) with 2 Basement Carparks, Swimming Pool and Communal Facilities On Lots 370X, 371L,372C, 373M, 374W, 375V, 382K, 383N, 384X, 385L, 386C, 387M,488L, 533C, 535W,537P, 539A, 623M, 1409N and 1410A TS 21 At Lengkok Angsa /Paterson Road (River Valley Planning Area)

    Developer/ Owner Bukit Sembawang View Pte Ltd
    Design Architect DP Architects Pte Ltd
    Civil & Structural Engineers KTP Consultants Pte Ltd
    M&E Consultant Engineers J Roger Preston (S) Pte Ltd
    Landscape Consultant Ong & Ong Pte Ltd
    Quantity Surveyors KPK Quantity Surveyors (Singapore) Pte Ltd
    Main Contractor Keong Hong Construction Pte Ltd
    Contract Period 10 Aug 11 - 09 Feb 14
    Duration 30 Months
    Progress Photo - 10 Sept 2011
    http://www.keonghong.com/Projects/Paterson2.aspx