Been a vivid reader of this forum and many pointers brought up were over time do materialize some what.
However this NS 12 thing is really a black pot.... It's end of year, still not a breathe of hint from official source, from transport master plan to land master plan and also the population white paper , etc etc...the only mentioning is the study or consideration for NS12 from official source ..... The rest all speculations......
Hope there will be some announcement soon, be it go ahead or scrap....wait is always the most sickening part.....no sound no pic is worst than spoilt, as at least know spoilt can go get new tv, hunt for sale...no sound no pic but seems like not spoilt is worse......
ai lai liao. Saw some machinery at the site.
hope so lah, many people wait till eye long long liao
now still havent announce , till it ready still have to wait few years lah . not so soon . look at the west side Dover mrt take how long for them to complete .
maybe for the road building to connect the 2 Canberra Drives?
Dis is great....finally
maybe announce in coming election...as usual plan !
alamak, hope NS 12 MRT Station won won chiak bee hoon, soon soon kia chun . Huat R
Mai long Piak will do.
Hello Bro 888, mix development opp NS12mrt when open for tender? any news?
power grip have been doing the underground cable near the traffic junctions since last month. These could be the machines that they used.
The reason why i initially guess these are for the new road to link 2 Canberra Drives are:
1. There are some works near CR is currently under-way (although i don't what they are doing, no construction board setup).
2. The new EC land sale from HDB (which was sold to CDL) requires the developer to do a signalized junctions at Canberra Drive and Canberra lane within first 1 or 2 years. So, building new road is confirmed.
of course, i do hope these machines are for NS12.
Pertaining to the ec site, there are many ground works need to be done. Not so fast. Earliest site action in June.
Construction of Yishun temporary bus interchange will start late this month or next but not after May. Completion in Nov or Dec.
Building works for latest Mar Btos will start in July/Aug. Take note of the location which is now empty.
沉默,没有希望的感觉。 NS12,多久你可以给义顺人带来希望?
已经有lobang了。看到机器在那里钻洞, 哈哈哈!发发发
no news? bian chia lar.