Page 3 of 3 FirstFirst 123
Results 21 to 26 of 26

Thread: The Clement Canopy @ Clementi Ave 1 - Launching Soon

  1. #21

    Default The Clement Canopy Remaining Units left

    Based on the latest information, The Clement Canopy is already more than 88% sold and less than 60 units left !

    2BR Standard ~ Fully sold
    2BR Premium ~ Fully sold
    3BR Standard ~ Still available
    3BR with Guest Room ~ Still available
    4BR Standard ~ Last few units left



    For more information, refer to The Clement Canopy

  2. #22

    Default

    100% sold and TOP in Q1 2019 according to UOL's results presentation slides.

  3. #23

    Default

    Quote Originally Posted by bargain hunter View Post
    100% sold and TOP in Q1 2019 according to UOL's results presentation slides.
    Wow! TOP in less than 2 years of launch!

  4. #24

    Default

    Quote Originally Posted by azeoprop View Post
    Wow! TOP in less than 2 years of launch!
    yes, using some new technology to build it seems. the buildings already look ready.

  5. #25
    Join Date
    Jun 2009
    Location
    Southbank
    Posts
    8,025

    Default

    Quote Originally Posted by bargain hunter View Post
    yes, using some new technology to build it seems. the buildings already look ready.
    All GLS after them need to use this PPVC system.

    THE CLEMENT CANOPY, SINGAPORE
    This is the first structure on the island using an all-concrete version of the PPVC system.

    https://www.concreteconstruction.net...py-singapore_o

  6. #26
    Join Date
    Jun 2009
    Location
    Southbank
    Posts
    8,025

    Default

    PROJECTS
    THE CLEMENT CANOPY, SINGAPORE
    This is the first structure on the island using an all-concrete version of the PPVC system.
    By Zack Zerndt
    THE CLEMENT CANOPY
    View All 7 Photos >
    Play slideshow
    The world’s tallest building using a concrete prefabricated pre-finished volumetric construction (PPVC) system is being built in Singapore. The Clement Canopy condominium project that is the first structure on the island to use an all-concrete version of the PPVC system.

    PPVC is a method in which free-standing volumetric modules-complete with finishes for walls, floors, and ceilings-are prefabricated and then erected onsite. Much of the construction is done offsite in a controlled environment where productivity and safety are optimal and dust pollution is minimized.

    There are 1,866 modules, and the contractor, Dragages Singapore, lifts an average of five modules per day, and is aiming to increase to eight as the project progresses. It takes about 13 cubic yards of concrete to make a 27-ton PPVC module.

    The total lifting operation is scheduled to take about 14 months. The heaviest module will weigh almost 64,000 pounds; the lightest about 37,000 pounds.

    Comprising two 40-short tower blocks, the project will have 505 apartments with a total floor area of 490,000 square feet. Under Singapore's land-sale requirements, 65% of the superstructure has to be built using reinforced concrete PPVC modules.

    The contractor is using two Liebherr 1000 EC-H 40 Litronic High-Top tower cranes to erect the two 40-story towers. These tower cranes have a lift capacity of more than 88,000 pounds at a working radius of 114 feet.

    Seng Swear Wern, civil production manager on the project, says that PPVC has reduced workers onsite, but increased the number of personnel involved in the factory prefabrication. The project should be complete by the end of 2020.