good one for ERL. but i was wondering about the logistics behind it. i see bukit timah need so much land beside the road to be used up when building stations. thomson line, they chose places which are wide enough and sitting on gahmen land.
in east coast, the roads are already so narrow. i can imagine a nightmare when the ERL construction takes place.
Originally Posted by blackjack21trader