jtpy, did they change the main door lock and pass you the new set of keys as part of the hand over process?
Originally Posted by jtpy
jtpy, did they change the main door lock and pass you the new set of keys as part of the hand over process?
Originally Posted by jtpy
Err, didn't jtpy say he still getting those defects rectified? Shouldn't the new keys come into effect only upon proper hand-over of the unit i.e. after everything is in acceptable order?Originally Posted by nadoey
Yes, they do.. But the stupid thing is you have to give it back to them to go in to do defects.. I'm going to change another lock after they complete the defects..Originally Posted by nadoey
They'll change to a new lock as per my last post...Originally Posted by cutematilda
Great news for new residents of Jln Bunga Rampai !!!
Our estate will be upgraded with the following (Attached as well) :
1) Our own identity - Jln Bunga Rampai Estate with our own logo. Malay means- Potpourri of flowers and frangrances.
2) Recreational facilities - Children playground, hardcourt soccer, elderly exercise station, community garden, etc
3) Covered drains and new walkways
4) Rain shelters
5) Ramps for accessibility
Dr Fatimah, MP for Marine Parade GRC hosted the briefing yesterday. The project will take about 2 years. The first year will be the sewage and drains first. The residents also raised the issue of shortcut to Bartley MRT and foreign workers. The shortcut will be studied by LTA and hopefully soonest. The foreign workers are gradually relocated and moving away as the construction in the area ceases. The viaduct will be ready by mid 2010 with speed limit up to 70 km/h so we can get to the east very fast.
Overall, great news for us.
The only thing that pissed us off was the LTA spokesperson's arrogant attitude and resistant to listening to our ideas on the shortcut to Bartley MRT. Covered walkways to MRT is too expensive and thus we only get rain shelters. She (Sharon) even quoted that 50 m additional walk is good training for our children! Ridiculous.
Imagine an elderly walking in the rain with traffic at 70km/h just beside. Anyone with power to influence LTA, pls do so before an accident happens.
The upgrading is indeed good news. Hopefully the shortcut/ sheltered walkway to Bartley MRT comes true as it would definitely be a plus point.
Btw I was at OG on Sat and the winds were so strong that it blew the deck chairs into the swimming pool. Had to go tell the security guards to go do something about it but he did not attend to it immediately.
This is something which will happen quite often (deck chairs falling into the pool) and I think we need to do something about it.
Feeling quite annoyed now. Caught the workers smoking and sleeping in the bedrooms. Plus using the plugs in house for charging of HP. Cam overlook the charging of HP part but really cannot tolerate them smoking in house. Now the bedroom reeks of cigarette smell.
Small thing, when you do your renovations, workers will paint and clean all the walls Your room will be brand new again. Next time don't go looking. What you don't see, you don't know.Originally Posted by joetankk
Banger, thanks for the information although it would be nice if we could get to the Bartley MRT via the Gerhka compound but we know that's not going to happen. I like the idea of a little community area.
hi banger, you attended some meeting with MP?? Thanks for sharing the info
Just previewed our unit - since it's preview, suppose it's normal to see not so clean & lots of unfinished stuff? Quite disappointed with the workmanship, especially the capentry
Just to encourage all who have seen the white doors of the cabinets. When I first saw them I was pretty disappointed. However after touching up and peeling off the protective layers (after your reno), they actually look pretty ok and matches quite well with my furnishings. So do get the developer to touch up the scratches, chips etc and it will be fine. You may want to do a door catch on the shoe cabinet door nearest the dry kitchen. (Mine will open up when the wind gets too strong and it will slam open)
some positives after all the negativity. The defects team is really efficient in the rectification process. Workmanship is good too
This sound good.... cos I have a few pages of defects too..
Originally Posted by joetankk
Oh.... all my white doors protective layers are already removed when I got our keys today... Now I have additional worries... from white become black after defect rectification & renov....
Originally Posted by edwinleeap
Agreed with you... wind is strong.. saw 2 deck chairs in the pool this afternoon...
If rain + strong wind + balcony slide door not close...
oh.. furniture will get free shower ...
Originally Posted by statix
A question for all those who viewed or collected keys or move in OG owners, are all the rooms floor timber strips lacquered? Mine look so old, rough, stains and full of scratches ....
Okie thanks. I should be more positive like joetankk and look on the brigher side, things aren't so bad really. The landscaping is superd & can't wait to collect my keys then can officially go swimmingOriginally Posted by edwinleeap
Btw, notice nobody mentioned the tennis, so to add here, will try to pratise my swing there too ... the court looks good
lol, i wonder if they will keep some gold fishes or koi in the water features areasOriginally Posted by cutematilda
Yalor, I also wonder. Coz there are a few pretty nice water feature spots; one at the main foyer near the bridge, the other is the one with the big vase near the pool. It will be good to keep some koi at the first one, which they just need to clean up a little. The latter is more suitable for smaller fishes?Originally Posted by joetankk
Can't wait to swing my racket at the tennis court ... swing swing
Wat a small world... the day we collect our keys... met our new neighbor... and we end up viewing each other unit... that was fun... And both our small kids are of the same age... planning for the same school... its fate we met.. at none other place... our new home... Oasis Garden...
See if we will meet each at OG.. Even so, we may not know that we are from this forum, hee hee hee .. Does not really matter, just a simple smile to each other will make our day a little brighter & sweeter..
Hi jtpy, may I ask how's the progress for the rectification? Would you be aiming to move in for Xmas/New Year?Originally Posted by jtpy
Almost done.. But... in the process of rectifications, they chipped 2 of my "ok" tiles and now I have to wait even longerOriginally Posted by cutematilda
Moving in more like to catch CNY now..
Finishing already? We now waiting for developer to mail us letter; those three sums of $$ as submittedOriginally Posted by jtpy
Hi Jtpy, did u take photos of the defects as well? or did u just submit the defects list to them?Originally Posted by jtpy
No need to take photos. Once you have written and submitted the list of defects, you would need to arrange a time with the defects IC , Monzu to do a joint inspection and you can show him exactly what is wrong.Originally Posted by noops
Almost done.. reno can prob start soon..Originally Posted by cutematilda
As wat Statix says.. jus need to go through with defects ic.. And remember to mark defects with masking tape..Originally Posted by noops
This is great news for u ...
Originally Posted by jtpy
Think our list would be something like yours dunno how come can have scratches on the oven one (meanwhile, hubby whole day face black-black).Originally Posted by jtpy
Hi nadoey, so you also got good news like jtpy?