Page 4 of 19 FirstFirst 1234567891011121314 ... LastLast
Results 31 to 40 of 187

Thread: Singapore Billion dollar project.

  1. #31
    Join Date
    Jun 2009
    Location
    Southbank
    Posts
    8,180

    Default Singapore Power to spend $2 billion on deep underground cable tunnel


  2. #32
    Join Date
    Mar 2012
    Posts
    4,990

    Default

    looks like a recession is indeed coming.
    more and more construction projects committed.
    latest productivity numbers not good at all as well.

  3. #33
    Join Date
    Jun 2009
    Location
    Southbank
    Posts
    8,180

    Default

    Quote Originally Posted by carbuncle
    looks like a recession is indeed coming.
    more and more construction projects committed.
    latest productivity numbers not good at all as well.
    Recession is already here.

  4. #34
    Join Date
    Jun 2009
    Location
    Southbank
    Posts
    8,180

  5. #35
    Join Date
    Mar 2012
    Posts
    4,990

  6. #36
    Join Date
    Jun 2009
    Location
    Southbank
    Posts
    8,180

    Default Downtown line budget rises to $20.7b from $12b


  7. #37
    Join Date
    Jun 2009
    Location
    Southbank
    Posts
    8,180

    Default

    Last edited by Arcachon; 26th August 2013 at 01:58 AM.

  8. #38
    Join Date
    Jun 2009
    Location
    Southbank
    Posts
    8,180

  9. #39
    Join Date
    Jun 2009
    Location
    Southbank
    Posts
    8,180

  10. #40
    Join Date
    Jun 2009
    Location
    Southbank
    Posts
    8,180

    Default



    Singapore (18 December 2011) – Ed. Züblin AG, Singapore Branch announced the successful completion of a record-breaking single drive tunnel using pipe jacking method in the Asia- Pacific region.

    Züblin was awarded the SGD 23.6 million Submarine Gas Transmission Pipeline Project by Power Gas Ltd., Singapore in January 2011 with contract duration of 24 months. The scope comprised sinking of two deep shafts and an ID2000mm reinforced concrete tunnel over a record length of 1.55km crossing beneath the busy shipping lanes of the West Jurong Channel, including the design, manufacture and supply of precast RC jacking pipes. The tunnel will house a DN700mm high pressure gas transmission pipeline, traversing between the Singapore mainland and Jurong Island.

    https://www.youtube.com/watch?v=9PevpS9wmts

Posting Permissions