Originally Posted by LG168
This is possible... but i also believe that if NS12 confirmed, the GLS beside the tracks will be done in parallel and subsequently....
in 1 or 2 years time... 8CY, CR, Nautical, 1C, will be ready... plus the existing YS+YE and residents nearby + the BTO at sembawang CC... human traffic is ready!
if Dover station can open, i don't see why NS12 can't open.....