View Poll Results: [Poll] Do you want NS12 to be built by 2015?

Voters
54. You may not vote on this poll
  • Yes! I want it built! If you are Men in White! You better do it to get my vote!

    36 66.67%
  • No. I want to end my miserable life in Singapore, e.g. falling off congested MRT platforms.

    10 18.52%
  • Ehhh... Seriously, I don't care because I'm an elite and I stay in CCR like the President.

    8 14.81%
Page 9 of 10 FirstFirst ... 45678910 LastLast
Results 241 to 270 of 299

Thread: [Poll] MRT NS12 - Do you want it built by 2015?

  1. #241
    Join Date
    Oct 2012
    Posts
    111

    Default

    Quote Originally Posted by Pro888
    Let me ask u bro. Do you know where is the exact location of future ns6 be?
    The only possible site is what northern star has mentioned, doesn't need a rocket scientist to make a smart guess. Slightly further up is canal which is also inline with the tender requirements. Park connector applies to ns12 only.

  2. #242
    Join Date
    May 2011
    Posts
    599

    Default

    Quote Originally Posted by Jornada
    The only possible site is what northern star has mentioned, doesn't need a rocket scientist to make a smart guess. Slightly further up is canal which is also inline with the tender requirements. Park connector applies to ns12 only.
    the tender is referring to NS12 definitely.

    The canal near ns6 is quite far. No way it will affect the station construction. Ns12 is different, they need extra road to link up the seperated canberra drive and access to the station. Ns6 as I mentioned previously, need to demolish at least one factory there.

  3. #243
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by Jornada
    The only possible site is what northern star has mentioned, doesn't need a rocket scientist to make a smart guess. Slightly further up is canal which is also inline with the tender requirements. Park connector applies to ns12 only.
    Factor in plans for road diversions, etc for vehicular bridge across existing canal

    Both canals @ kranji are nowhere near the speculated station. Seem like you are not very sure about the place. One nearer to yew tee mrt (3/4 streets away) while the other nearer to Kranji (2/3 streets away). I have mentioned many months ago on these 2 stations. The ns6 along Sungei kadut ctrl got 2 bus bays.

    Why factors in plan for road diversion? If they are going to build ns12 (which is only about 15-20m away from ave2), so they will need a lane to construct. Right after the bridge or yishun sapphire.
    Which one needed more? Which one has been mentioned in masterplan? How to sell land with plot ratio 1.4 near landed (it stretches from Canberra Res to canal - refer to masterplan 2008) ? Residents in Bto will face daily commuting problems.

  4. #244
    Join Date
    May 2011
    Posts
    599

    Default

    Quote Originally Posted by NO_7
    How about a mix dev together with this Stn?
    I guess only something like admirlty point. The white site for commercial is at sembawang mrt there.

  5. #245
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by NorthernStar
    I guess only something like admirlty point. The white site for commercial is at sembawang mrt there.
    Bro, please do not discuss to much abt the mall. I can pm why.

  6. #246
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by NorthernStar
    I guess only something like admirlty point. The white site for commercial is at sembawang mrt there.
    Since you mentioned Sembawang mrt, then i would like to share something here.

    North coastal line might (guess only) starts from here. See the HDB flats (blk 589D to 590C) "curve" nicely for the line to run along Sembawang rd and turns into Simpang. From the start, Sembawang bus interchange was being built with minimum cost (temp structure). So the line will run above montreal park.

  7. #247
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by Pro888
    Bro, please do not discuss to much abt the mall. I can pm why.
    Just pm.

  8. #248
    Join Date
    May 2011
    Posts
    599

    Default

    Quote Originally Posted by Pro888
    Since you mentioned Sembawang mrt, then i would like to share something here.

    North coastal line might (guess only) starts from here. See the HDB flats (blk 589D to 590C) "curve" nicely for the line to run along Sembawang rd and turns into Simpang. From the start, Sembawang bus interchange was being built with minimum cost (temp structure). So the line will run above montreal park.
    Yup.. this was the plan i saw in concept plan 2001. The speculated NCL will connect to Sembawang and Sembawang was described as a regional town while woodlands is the regional center. NS12 will be the transit LRT line for inner Yishun or Simpang town.

    When i saw the temp bus station xx years ago, i thought the real development should be coming soon but quite disappointed on the development speed here. but it's ok to be slow last time as during that time, my saving not enough to buy property yet...

  9. #249
    Join Date
    Oct 2012
    Posts
    111

    Default

    Quote Originally Posted by Pro888
    Factor in plans for road diversions, etc for vehicular bridge across existing canal

    Both canals @ kranji are nowhere near the speculated station. Seem like you are not very sure about the place. One nearer to yew tee mrt (3/4 streets away) while the other nearer to Kranji (2/3 streets away). I have mentioned many months ago on these 2 stations. The ns6 along Sungei kadut ctrl got 2 bus bays.

    Why factors in plan for road diversion? If they are going to build ns12 (which is only about 15-20m away from ave2), so they will need a lane to construct. Right after the bridge or yishun sapphire.
    Which one needed more? Which one has been mentioned in masterplan? How to sell land with plot ratio 1.4 near landed (it stretches from Canberra Res to canal - refer to masterplan 2008) ? Residents in Bto will face daily commuting problems.
    Granted. So I suppose the clause on railway is just a general requirement.....

  10. #250
    Join Date
    Feb 2013
    Posts
    69

    Default

    After reading above messages, I still no clue where exactly the NS12 will be located. Near CR or 8C?

  11. #251
    Join Date
    Mar 2010
    Posts
    515

    Default

    Quote Originally Posted by cedarlake1
    After reading above messages, I still no clue where exactly the NS12 will be located. Near CR or 8C?
    The flat land just beside the road, can view from MRT.

  12. #252
    Join Date
    Feb 2013
    Posts
    69

    Default

    Quote Originally Posted by cashrich
    The flat land just beside the road, can view from MRT.
    Near the road just built? Or near he canel?

  13. #253
    Join Date
    Mar 2010
    Posts
    515

    Default

    Quote Originally Posted by cedarlake1
    Near the road just built? Or near he canel?
    My guess only.

    Look at Masterplan. It has to be in between Sembawang and Yishun MRT. Logically, should be at mid point of the two as anywhere else is too short a distance to the other.

    Of the two plots of subject to detailed planning, the one between the new road and the 8 Court Yard is more likely. The flat piece of land has been there for the longest time. Why was it done so nicely and flat when they could leave it as a forest? It was done almost at the same time when the line is up. Just my guess as we are making speculative guesses here. If not, it would be stated as a fact.

    MK19-01211M

  14. #254
    Join Date
    Feb 2013
    Posts
    69

    Default

    Quote Originally Posted by cashrich
    My guess only.

    Look at Masterplan. It has to be in between Sembawang and Yishun MRT. Logically, should be at mid point of the two as anywhere else is too short a distance to the other.

    Of the two plots of subject to detailed planning, the one between the new road and the 8 Court Yard is more likely. The flat piece of land has been there for the longest time. Why was it done so nicely and flat when they could leave it as a forest? It was done almost at the same time when the line is up. Just my guess as we are making speculative guesses here. If not, it would be stated as a fact.

    MK19-01211M

    I see..Hope near the new road side....that leads to SSC area

  15. #255
    Join Date
    Nov 2011
    Posts
    270

    Default

    tis page sleep long time liao, any NS12 news, today property vol down 655 compared with last month, hope NS12 can help surrounding property.

  16. #256
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by Nman
    tis page sleep long time liao, any NS12 news, today property vol down 655 compared with last month, hope NS12 can help surrounding property.
    Quiet bcoz waiting for announcement mah.

    GLS in Jun
    4th week of March - Bto launches and at the same time, information on May bto sites. Canberra currently got 5 batches and will progressively roll-out (maybe in May/ Jul/ Sep).

  17. #257
    Join Date
    May 2011
    Posts
    599

    Default

    ya.. waiting for announcement...

  18. #258
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by Pro888
    Quiet bcoz waiting for announcement mah.

    GLS in Jun
    4th week of March - Bto launches and at the same time, information on May bto sites. Canberra currently got 5 batches and will progressively roll-out (maybe in May/ Jul/ Sep).
    Bingo. Canberra Bto in May with 2100 units, the most in May bto launches.

    Advanced Consultancy Services for a New Station on NS12 has been extended by another week, closing on 27th March.

  19. #259
    Join Date
    May 2011
    Posts
    599

    Default

    Quote Originally Posted by Pro888
    Bingo. Canberra Bto in May with 2100 units, the most in May bto launches.

    Advanced Consultancy Services for a New Station on NS12 has been extended by another week, closing on 27th March.
    Bro Pro888 so resourceful... Thanks for the update!

  20. #260
    Join Date
    Jun 2010
    Posts
    1,140

    Default

    Waiting impatiently. .....

  21. #261
    Join Date
    Feb 2013
    Posts
    69

    Default

    Guess where NS 12 will be..

  22. #262
    Join Date
    Aug 2008
    Posts
    85

    Default

    Quote Originally Posted by cedarlake1
    Guess where NS 12 will be..
    Canberra Lane

  23. #263
    Join Date
    Feb 2013
    Posts
    69

    Default

    Quote Originally Posted by mkmm
    Canberra Lane
    Bingo!

    And will built before 2015!

  24. #264
    Join Date
    Nov 2011
    Posts
    270

    Default

    My fren told me yesterday he saw a group of peoples visit longkang there take photo, study that area and check sheet record, etc. I think NS 12 coming soon, appreciate for yishun MP hard work, hope MRT station can complete asap.

  25. #265
    Join Date
    Nov 2011
    Posts
    270

    Default

    NS12 tender closed on 27-3, No of tenderers participate=10, how long lta need to decide? 2month/ 3 month / 6 month? If 6month, project work 1.5year, thy that can complete within 2 yr.

  26. #266
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by Nman
    NS12 tender closed on 27-3, No of tenderers participate=10, how long lta need to decide? 2month/ 3 month / 6 month? If 6month, project work 1.5year, thy that can complete within 2 yr.
    Wldnt take long (less than 3 months for next phase). As i said before, it will be operational in 2016.

    When announcement?

    1.Detail plan in May bto considering 2100 units?
    2. Jun gls?
    3. exhibition late jun/ early jul?

  27. #267
    Join Date
    Nov 2011
    Posts
    270

    Default

    Quote Originally Posted by Pro888
    Wldnt take long (less than 3 months for next phase). As i said before, it will be operational in 2016.

    When announcement?

    1.Detail plan in May bto considering 2100 units?
    2. Jun gls?
    3. exhibition late jun/ early jul?
    Actual location still dunno, hope beside longkang just nice, not far away from Yishun MRT and not too near to Sembawang MRT, at least can benefit for surrounding condo and landed near by and HDB along yishun ave 7 and Yishun St 22, New Bto, industrial area ,etc..

  28. #268
    Join Date
    Jun 2009
    Posts
    5,675

    Default

    http://esales.hdb.gov.sg/hdbvsf/eamp...wang%20map.pdf

    New bto in Sembawang, looks like a new mrt station around canberra lane will be imminent.

  29. #269
    Join Date
    May 2012
    Posts
    448

    Default

    Quote Originally Posted by azeoprop
    http://esales.hdb.gov.sg/hdbvsf/eamp...wang%20map.pdf

    New bto in Sembawang, looks like a new mrt station around canberra lane will be imminent.
    Nothing new....isn't the attached map posted by cedarlake1 at thread #261?

  30. #270
    Join Date
    Aug 2008
    Posts
    85

    Default

    New bto in Sembawang, looks like a new mrt station around canberra lane will be imminent. [/QUOTE]
    yes..!

Similar Threads

  1. ns12 mrt tender awarded !!!
    By Pro888 in forum Far North
    Replies: 140
    -: 23-06-15, 14:51
  2. Poll on JAM at Holland Road
    By DaytonaSS in forum Singapore Private Condominium Property Discussion and News
    Replies: 15
    -: 08-04-11, 08:46
  3. POLL - DOWNPAYMENT
    By jbond in forum Finance and Legal
    Replies: 29
    -: 15-07-10, 15:53
  4. Investments Poll
    By gfoo in forum HDB, EC, commercial and industrial property discussion
    Replies: 1
    -: 06-07-10, 22:34

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •