Page 12 of 16 FirstFirst ... 278910111213141516 LastLast
Results 331 to 360 of 455

Thread: D'nest@Pasir Ris Grove >>>2013

  1. #331
    Join Date
    Feb 2013
    Posts
    188

    Default

    Quote Originally Posted by phayvictor
    I think the construction is done by parson brinckerhoff. Not sure whether they have started it or not.
    Oh No...same as The Palette.....have to wait long long

  2. #332
    Join Date
    Dec 2012
    Posts
    22

    Default

    Quote Originally Posted by johnski
    Hi all,

    I just booked a 4br at D'nest. Happy to see fellow nesties.
    hi johnski, same here

  3. #333
    Join Date
    Aug 2012
    Posts
    379

    Default

    Quote Originally Posted by littlegarden
    hope i dun regret this purchase instead of stratum or this upcoming one
    Once purchased. Move on. No regret!

  4. #334
    Join Date
    May 2013
    Posts
    125

    Default

    Quote Originally Posted by eng81157
    then all these developments - lvia, NV, palette and dnest aren't within walking distance for sure.

    unless your pace means brisk walk or slow jog.
    The not-yet launched parcel of land (where the showflat sits) is definitely ten-minutes walk from the mrt, if not lesser. If lucky enough not to be stopped by the traffic light, walking from D'Nest to the mrt also can be achieved within 10 mins. The realistic question is whether you wants to get sweaty walking to MRT in the almost always over-sunny mornings, though the distance to mrt is definitely within reach by walk.

  5. #335
    Join Date
    May 2009
    Posts
    3,677

    Default

    Quote Originally Posted by LiveYoung
    The not-yet launched parcel of land (where the showflat sits) is definitely ten-minutes walk from the mrt, if not lesser. If lucky enough not to be stopped by the traffic light, walking from D'Nest to the mrt also can be achieved within 10 mins. The realistic question is whether you wants to get sweaty walking to MRT in the almost always over-sunny mornings, though the distance to mrt is definitely within reach by walk.
    10mins from the (bird's) nest?? this is the farthest of the lot from the MRT.

    of course it is walkable. i can also hike from jurong to changi, it's walkable too.

  6. #336
    Join Date
    May 2013
    Posts
    125

    Default

    Quote Originally Posted by eng81157
    10mins from the (bird's) nest?? this is the farthest of the lot from the MRT.

    of course it is walkable. i can also hike from jurong to changi, it's walkable too.
    Google "D'Nest Location Map" and you will find as a matter of fact, D'nest is actually not the farthest from the MRT out of the five land parcels at Pasir Ris Grove.

  7. #337
    Join Date
    Mar 2012
    Posts
    202

    Default

    Quote Originally Posted by LiveYoung
    Google "D'Nest Location Map" and you will find as a matter of fact, D'nest is actually not the farthest from the MRT out of the five land parcels at Pasir Ris Grove.
    Can cut across Costa ris right? Within ten mins for most pple I guess. Except for the few blocks near the entrance for NV and Livia, it is actually quite a distance away. Anyway, pasir ris grove is already the closest to MRT.

  8. #338
    Join Date
    Feb 2013
    Posts
    188

    Default

    Quote Originally Posted by eng81157
    10mins from the (bird's) nest?? this is the farthest of the lot from the MRT.

    of course it is walkable. i can also hike from jurong to changi, it's walkable too.
    You must be very fit...why not just walk from Jb?

  9. #339
    Join Date
    May 2009
    Posts
    3,677

    Default

    Quote Originally Posted by Mu
    You must be very fit...why not just walk from Jb?
    hint: take note of the subtle sarcasm

  10. #340
    Join Date
    Jun 2013
    Posts
    14

    Default

    Quote Originally Posted by littlegarden
    hi johnski, same here
    Which stack is yours?

  11. #341
    Join Date
    Feb 2009
    Posts
    4

    Default

    stack 63. yours?

  12. #342
    Join Date
    Dec 2012
    Posts
    22

    Default

    kaypochee77, mine is at 46, 4bd. johnski's one is bigger, 4bd suite.

  13. #343
    Join Date
    Jun 2013
    Posts
    14

    Default

    Mine is 47. Does anyone here know if Dnest is going to have a side gate? Quite a big development to not to have any. Even Livia have two main gates.

  14. #344
    Join Date
    May 2013
    Posts
    16

    Default

    According to agent, there is no side gate as beside it is the expressway slip road. .

    Anybody can share of the construction progress of D'Nest?

  15. #345
    Join Date
    Jun 2013
    Posts
    169

    Default

    Initially I thought of considering stack 63, there is a generator and alfresco bbq nearby. Furthermore, with no side gate and facing near express way; walking to main entrance would take about 300m plus another 700m to pasir ris mrt...very very far. Though the 4br suite price is very attractive but would be damn difficult to get buyers in future.

    The agent told me that nowadays generator is very quiet. After finding out, it is not really true. It will still release those irritating high frequency noise which may affect those who staying at lower level.

    I hope the karaoke and jam studio room is totally conceal and the noise will not affect the resident.

    The agent also told me the alfresco bbq is unlike traditional bbq using charcoal. It is those grill outdoor type but what is the difference? The smoke will still get into stack 63 lower level depending on wind direction.

    I would think stack 35 is slightly better even substation is there. At least the view is worth every cents spend.

  16. #346
    Join Date
    Dec 2012
    Posts
    22

    Default

    Quote Originally Posted by kaypochee77
    Mine is 47. Does anyone here know if Dnest is going to have a side gate? Quite a big development to not to have any. Even Livia have two main gates.
    wa...closest neighbor found...

  17. #347
    Join Date
    Dec 2012
    Posts
    22

    Default

    hi strata, so u bought one in stack 35?

  18. #348
    Join Date
    May 2013
    Posts
    125

    Default

    Quote Originally Posted by littlegarden
    hi strata, so u bought one in stack 35?
    My guess is that he bought Stratum instead.

  19. #349
    Join Date
    Feb 2013
    Posts
    188

    Default

    Dear D'nest neighbors...

    I hope my black hair won't turn to gray when they complete the project...Looks like all of us have to wait for a looooooong time

    Anyone got any infer on when they gonna start construction, pls share share

  20. #350
    Join Date
    Jun 2013
    Posts
    14

    Default

    Quote Originally Posted by littlegarden
    wa...closest neighbor found...
    Good
    I wonder how many units have they left. Anyway to check.

  21. #351
    Join Date
    Dec 2012
    Posts
    22

    Default

    Not sure when construction will start. Guess either we can ask via CDL website. Or look at the periodically updated TOP progress. Next update 30 June. The current one don't even list D'Nest in it.

    http://www.cdl.com.sg/app/cdl/divers...p_progress.xml

  22. #352
    Join Date
    Dec 2012
    Posts
    22

    Default

    Quote Originally Posted by kaypochee77
    Good
    I wonder how many units have they left. Anyway to check.
    Not sure, may have to head down to showflat or check with Huttons?

  23. #353
    Join Date
    Mar 2012
    Posts
    202

    Default

    Quote Originally Posted by littlegarden
    Not sure when construction will start. Guess either we can ask via CDL website. Or look at the periodically updated TOP progress. Next update 30 June. The current one don't even list D'Nest in it.

    http://www.cdl.com.sg/app/cdl/divers...p_progress.xml
    I'm a palette owner and we just received the first payment notice - I.e. foundation completed. In the general scheme of things, it will be x months from now before there's any progress over at dnest, I guess.

  24. #354
    Join Date
    Feb 2013
    Posts
    188

    Default

    Quote Originally Posted by sleeping lamb
    I'm a palette owner and we just received the first payment notice - I.e. foundation completed. In the general scheme of things, it will be x months from now before there's any progress over at dnest, I guess.
    Really disappointed at the slow pace....Many people thought very highly of CDL due to the quick completion of NV....

  25. #355
    Join Date
    Mar 2012
    Posts
    202

    Default

    Quote Originally Posted by Mu
    Really disappointed at the slow pace....Many people thought very highly of CDL due to the quick completion of NV....
    Not that bad considering the size and facilities to be built

  26. #356
    Join Date
    Feb 2013
    Posts
    188

    Default

    Quote Originally Posted by sleeping lamb
    Not that bad considering the size and facilities to be built
    Hope we'll be alive by then

  27. #357
    Join Date
    Dec 2012
    Posts
    22

    Default

    wa Mu, relax haha...

    Good to breathe in fresher air now!

  28. #358
    Join Date
    Feb 2013
    Posts
    188

    Default

    Quote Originally Posted by littlegarden
    wa Mu, relax haha...

    Good to breathe in fresher air now!

    Haha true true

    Anyways for the price and facilities, wait still ok

  29. #359
    Join Date
    May 2013
    Posts
    16

    Default

    Hi anybody knows if the crane at Dnest is operating or just deploy there?

  30. #360
    Join Date
    Dec 2012
    Posts
    22

    Default

    hi greybear, you also a future neighbor?

    maybe can compile a list soon haha

Similar Threads

  1. Replies: 31
    -: 11-02-14, 06:44
  2. Pasir Ris' Ripple Bay is most popular condo in 2013
    By princess_morbucks in forum Singapore Private Condominium Property Discussion and News
    Replies: 0
    -: 30-12-13, 15:39
  3. D'nest Facebook
    By NV2010 in forum East
    Replies: 11
    -: 15-12-13, 06:09
  4. Replies: 193
    -: 21-02-13, 13:17
  5. Replies: 0
    -: 13-06-11, 00:36

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •