Page 3 of 5 FirstFirst 12345 LastLast
Results 61 to 90 of 141

Thread: ns12 mrt tender awarded !!!

  1. #61
    Join Date
    Feb 2012
    Posts
    338

    Default

    Quote Originally Posted by Shanhz View Post
    i pass by this path every week (after shopping trip at sembawang shp cntr). always wonder why this path is here, and has been here for many many years. i dare say this is before the construction of the landed houses (those houses have been here since 1980s or earlier), which means that it wasn't meant to be the path to the MRT in the first place.

    but not denying that it is now convenient to make it so.

    Erm.. Bro.. U mean there is already a path that cross the forest ah? Okok later go see see haha

  2. #62
    Join Date
    Feb 2013
    Posts
    6

    Default

    Been a vivid reader of this forum and many pointers brought up were over time do materialize some what.

    However this NS 12 thing is really a black pot.... It's end of year, still not a breathe of hint from official source, from transport master plan to land master plan and also the population white paper , etc etc...the only mentioning is the study or consideration for NS12 from official source ..... The rest all speculations......

    Hope there will be some announcement soon, be it go ahead or scrap....wait is always the most sickening part.....no sound no pic is worst than spoilt, as at least know spoilt can go get new tv, hunt for sale...no sound no pic but seems like not spoilt is worse......

  3. #63
    Join Date
    Jun 2010
    Posts
    1,140

    Cool

    Quote Originally Posted by fteocs View Post
    Been a vivid reader of this forum and many pointers brought up were over time do materialize some what.

    However this NS 12 thing is really a black pot.... It's end of year, still not a breathe of hint from official source, from transport master plan to land master plan and also the population white paper , etc etc...the only mentioning is the study or consideration for NS12 from official source ..... The rest all speculations......

    Hope there will be some announcement soon, be it go ahead or scrap....wait is always the most sickening part.....no sound no pic is worst than spoilt, as at least know spoilt can go get new tv, hunt for sale...no sound no pic but seems like not spoilt is worse......
    Buangkok MRT was opened after people planted White Elephant signs. Will people plant No Elephant signs near NS12 this time?

  4. #64
    Join Date
    Aug 2008
    Posts
    85

    Thumbs up

    Quote Originally Posted by solsys View Post
    Buangkok MRT was opened after people planted White Elephant signs. Will people plant No Elephant signs near NS12 this time?

  5. #65
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    ai lai liao. Saw some machinery at the site.

  6. #66
    Join Date
    Nov 2011
    Posts
    270

    Default

    hope so lah, many people wait till eye long long liao

  7. #67
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    now still havent announce , till it ready still have to wait few years lah . not so soon . look at the west side Dover mrt take how long for them to complete .

  8. #68
    Join Date
    May 2011
    Posts
    599

    Default

    maybe for the road building to connect the 2 Canberra Drives?

  9. #69
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by NorthernStar View Post
    maybe for the road building to connect the 2 Canberra Drives?
    The machinery are just right beside the track and i know what are those for and at what stage it will be used.

    New Btos opposite had completed this process last year.

  10. #70
    Join Date
    Feb 2012
    Posts
    338

    Talking

    Quote Originally Posted by Pro888 View Post
    The machinery are just right beside the track and i know what are those for and at what stage it will be used.

    New Btos opposite had completed this process last year.

    haha i saw those machines too... wondering when it starts

  11. #71
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Quote Originally Posted by xemz127 View Post
    haha i saw those machines too... wondering when it starts
    The machines maybe is for the new piece of land which has been trender . Maybe they are going to clearing all the trees and land for the new Ec next the mrt track .

  12. #72
    Join Date
    Feb 2012
    Posts
    338

    Wink

    Quote Originally Posted by Noexit View Post
    The machines maybe is for the new piece of land which has been trender . Maybe they are going to clearing all the trees and land for the new Ec next the mrt track .

    Noleh.. It's not the EC site. It's the mrt site just beside the track beside the longkang.. It's obvious..

  13. #73
    Join Date
    Oct 2011
    Posts
    1,668

    Default

    Quote Originally Posted by xemz127 View Post
    Noleh.. It's not the EC site. It's the mrt site just beside the track beside the longkang.. It's obvious..
    Which long kang the one near Yishun sapphire condo ?

  14. #74
    Join Date
    Jul 2013
    Posts
    5

    Default

    Quote Originally Posted by Pro888 View Post
    The machinery are just right beside the track and i know what are those for and at what stage it will be used.

    New Btos opposite had completed this process last year.
    Sorry bro....what are those machinery for and what stage u referring to. Please lighten up my dim brain. Thank you sir.

  15. #75
    Join Date
    Feb 2012
    Posts
    338

    Talking

    Quote Originally Posted by Noexit View Post
    Which long kang the one near Yishun sapphire condo ?
    Yeap!! Precisely at the location of Canberra mrt station

  16. #76
    Join Date
    Jun 2013
    Posts
    69

    Default

    Dis is great....finally

  17. #77
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by xemz127 View Post
    haha i saw those machines too... wondering when it starts
    Very soon. Idle machine very costly.

  18. #78
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by tkloongsg View Post
    Sorry bro....what are those machinery for and what stage u referring to. Please lighten up my dim brain. Thank you sir.
    No prob.

    It is installing underground pipes, conduits and cables. This is done before the foundation works of the site.

    Announcement should be very soon. This month !!! Maybe tomorrow.

  19. #79
    Join Date
    Feb 2012
    Posts
    338

    Default

    Quote Originally Posted by Pro888 View Post
    No prob.

    It is installing underground pipes, conduits and cables. This is done before the foundation works of the site.

    Announcement should be very soon. This month !!! Maybe tomorrow.

    wah sure boy so soon ah hahhaa

  20. #80
    Join Date
    Jun 2012
    Posts
    25

    Default

    maybe announce in coming election...as usual plan !

  21. #81
    Join Date
    Nov 2011
    Posts
    270

    Default

    alamak, hope NS 12 MRT Station won won chiak bee hoon, soon soon kia chun . Huat R
    Mai long Piak will do.

  22. #82
    Join Date
    Nov 2011
    Posts
    270

    Default

    Hello Bro 888, mix development opp NS12mrt when open for tender? any news?

  23. #83
    Join Date
    May 2011
    Posts
    599

    Default

    power grip have been doing the underground cable near the traffic junctions since last month. These could be the machines that they used.

  24. #84
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by NorthernStar View Post
    power grip have been doing the underground cable near the traffic junctions since last month. These could be the machines that they used.
    Very unlikely. The job had been completed, the machine will be removed quite immediately. Secondly, they wldnt leave it at 50m away from the road and 2m of ground elevation.

  25. #85
    Join Date
    May 2012
    Posts
    448

    Default

    Quote Originally Posted by Pro888 View Post
    Very unlikely. The job had been completed, the machine will be removed quite immediately. Secondly, they wldnt leave it at 50m away from the road and 2m of ground elevation.
    Steady pun pi pi, N12 Ai Lai Liao ?

  26. #86
    Join Date
    May 2011
    Posts
    599

    Default

    Quote Originally Posted by Pro888 View Post
    Very unlikely. The job had been completed, the machine will be removed quite immediately. Secondly, they wldnt leave it at 50m away from the road and 2m of ground elevation.
    The reason why i initially guess these are for the new road to link 2 Canberra Drives are:
    1. There are some works near CR is currently under-way (although i don't what they are doing, no construction board setup).

    2. The new EC land sale from HDB (which was sold to CDL) requires the developer to do a signalized junctions at Canberra Drive and Canberra lane within first 1 or 2 years. So, building new road is confirmed.

    of course, i do hope these machines are for NS12.

  27. #87
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by NorthernStar View Post
    The reason why i initially guess these are for the new road to link 2 Canberra Drives are:
    1. There are some works near CR is currently under-way (although i don't what they are doing, no construction board setup).

    2. The new EC land sale from HDB (which was sold to CDL) requires the developer to do a signalized junctions at Canberra Drive and Canberra lane within first 1 or 2 years. So, building new road is confirmed.

    of course, i do hope these machines are for NS12.
    Pertaining to the ec site, there are many ground works need to be done. Not so fast. Earliest site action in June.

    Construction of Yishun temporary bus interchange will start late this month or next but not after May. Completion in Nov or Dec.

    Building works for latest Mar Btos will start in July/Aug. Take note of the location which is now empty.

  28. #88
    Join Date
    Jul 2012
    Posts
    79

    Default

    沉默,没有希望的感觉。 NS12,多久你可以给义顺人带来希望?

  29. #89
    Join Date
    Nov 2011
    Posts
    270

    Talking

    已经有lobang了。看到机器在那里钻洞, 哈哈哈!发发发

  30. #90
    Join Date
    Jul 2012
    Posts
    79

    Default

    no news? bian chia lar.

Similar Threads

  1. CityLife@Tampines EC awarded TOP
    By reporter2 in forum HDB, EC, commercial and industrial property discussion
    Replies: 0
    -: 17-02-16, 18:14
  2. Jurong West executive condo tender awarded to Koh Brothers-Heeton JV
    By princess_morbucks in forum HDB, EC, commercial and industrial property discussion
    Replies: 0
    -: 16-01-14, 08:51
  3. Replies: 298
    -: 12-08-13, 11:19
  4. Elias Road land parcel tender awarded to Elitist Development
    By reporter2 in forum Singapore Private Condominium Property Discussion and News
    Replies: 1
    -: 20-04-12, 03:02
  5. Jurong West landed plot not awarded
    By mr funny in forum Landed Property
    Replies: 5
    -: 23-03-08, 16:18

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •