  1. #91
    Join Date
    Jun 2010
    Posts
    1,140

    Default

    Won't come until GE

  2. #92
    Join Date
    Jun 2012
    Posts
    25

    Default

    anyone know the exact location...

  3. #93
    Join Date
    May 2012
    Posts
    448

    Default

    Quote Originally Posted by N12MRT View Post
    anyone know the exact location...
    Should be about 5 to 6 min walk from New Condo Eight courtyard nearest side gate i.e. beside Yishun Sapphire and near to ABC waterway and traffic light.

  4. #94
    Join Date
    Jun 2012
    Posts
    25

    Default

    有听到声,没看到影...

  5. #95
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Tender to Design Development And Construction Of The Proposed Infrastructure Works At Jalan Sendudok/Canberra Link Area has just closed and will be awarded in August. Site clearance will begin roughly in Nov/Dec.

    Site ready for mrt civil works 1Q15
    Site ready for gls 2Q (unlikely) but most probably 3Q15 due to the construction of Canberra drive.

    Soon, very soon. They will announce, together with the neighbourhd ctr / shopping mall opposite.

    Tender process did show some urgency. Same goes to the ec plot. As i expected, reserve plot in April becomes confirmed plot in Aug.

  6. #96
    Join Date
    Jun 2013
    Posts
    20

    Default

    but where is this place? can you indicate the exact the patch of land for NS12 and future shopping mall?

    Quote Originally Posted by Pro888 View Post
    Tender to Design Development And Construction Of The Proposed Infrastructure Works At Jalan Sendudok/Canberra Link Area has just closed and will be awarded in August. Site clearance will begin roughly in Nov/Dec.

    Site ready for mrt civil works 1Q15
    Site ready for gls 2Q (unlikely) but most probably 3Q15 due to the construction of Canberra drive.

    Soon, very soon. They will announce, together with the neighbourhd ctr / shopping mall opposite.

    Tender process did show some urgency. Same goes to the ec plot. As i expected, reserve plot in April becomes confirmed plot in Aug.

  7. #97
    Join Date
    Jan 2013
    Posts
    83

    Default

    If you look at the Master plan, the mall for upcoming Sembawang is highlighted in light blue colour, means it will be a mall managed by HDB, so it will actually be a shopping plaza/mart.
    Those shopping centre managed by private entities, are highlighted in dark blue colour in
    the URA master plan.
    Look at the Masterplan, and compare of all surrounding shopping centres and HDB
    managed plaza, you will know what I mean.

  8. #98
    Join Date
    May 2011
    Posts
    599

    Default

    in Masterplan:
    light Blue : Mixed development
    Dark Blue : Pure commercial

    There is no indication of whether it is a HDB or private manage mall.

    However, in Canberra area, almost all the lands are managed by HDB.

  9. #99
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by Pro888 View Post
    Tender to Design Development And Construction Of The Proposed Infrastructure Works At Jalan Sendudok/Canberra Link Area has just closed and will be awarded in August. Site clearance will begin roughly in Nov/Dec.

    Site ready for mrt civil works 1Q15
    Site ready for gls 2Q (unlikely) but most probably 3Q15 due to the construction of Canberra drive.

    Soon, very soon. They will announce, together with the neighbourhd ctr / shopping mall opposite.

    Tender process did show some urgency. Same goes to the ec plot. As i expected, reserve plot in April becomes confirmed plot in Aug.
    Finally.

    The details, i est. will be before the release of ec plot land sales in Aug. They have to document it.

  10. #100
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    location, confirmed right after the canal.

    1. Refer to MP
    2. Straight mrt track
    3. New development
    4. Machines

  11. #101
    Join Date
    Nov 2011
    Posts
    270

    Default

    you very chun,
    confirm the location after the Canal? mean very near to Yishun Sapphire?

  12. #102
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by Nman View Post
    you very chun,
    confirm the location after the Canal? mean very near to Yishun Sapphire?
    Confirmed. Double confirmed.

    Those machines that laid cables...construction cones with LTA logo.

    Masterplan mixed development opp + 2 green stripes at the track side.

  13. #103
    Join Date
    Nov 2011
    Posts
    270

    Default

    Quote Originally Posted by Pro888 View Post
    Confirmed. Double confirmed.

    Those machines that laid cables...construction cones with LTA logo.

    Masterplan mixed development opp + 2 green stripes at the track side.
    Wow, ho say liao, may be not so soon, they build together with mixed development?

  14. #104
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by Nman View Post
    Wow, ho say liao, may be not so soon, they build together with mixed development?
    Different lah.

    Mixed dev by HDB - last year said within 5 years.

    Dover mrt took 22 mths to complete. This one i think abt 18mths. So i est will be completed within last Q16 to 3rd Q17. I have to consider how fast URA awards the tender to clear the forest, mrt civil works tender process, actual ground works etc. Lets see

  15. #105
    Join Date
    Nov 2011
    Posts
    270

    Default

    Quote Originally Posted by Pro888 View Post
    Different lah.

    Mixed dev by HDB - last year said within 5 years.

    Dover mrt took 22 mths to complete. This one i think abt 18mths. So i est will be completed within last Q16 to 3rd Q17. I have to consider how fast URA awards the tender to clear the forest, mrt civil works tender process, actual ground works etc. Lets see
    wait and see, i believed you, you quite accurate. hope before 2017 can get ready is our bonus point.

  16. #106
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by Pro888 View Post
    Finally.

    The details, i est. will be before the release of ec plot land sales in Aug. They have to document it.
    Bingo. Time of announcement on the details.

    Even though they said 2019 completion, but that is just est. Reference to Dover stn only took 22 mths.

  17. #107
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by Pro888 View Post
    Tender to Design Development And Construction Of The Proposed Infrastructure Works At Jalan Sendudok/Canberra Link Area has just closed and will be awarded in August. Site clearance will begin roughly in Nov/Dec.

    Site ready for mrt civil works 1Q15
    Site ready for gls 2Q (unlikely) but most probably 3Q15 due to the construction of Canberra drive.

    Soon, very soon. They will announce, together with the neighbourhd ctr / shopping mall opposite.

    Tender process did show some urgency. Same goes to the ec plot. As i expected, reserve plot in April becomes confirmed plot in Aug.
    My guess works quite zhun.

  18. #108
    Join Date
    Jun 2012
    Posts
    25

    Thumbs up

    if complete in 2017.you're la gi shun and LTA

  19. #109
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by N12MRT View Post
    if complete in 2017.you're la gi shun and LTA
    This one no diggin / Tunneling works. Dun need to take that long. How can this be possibly the the same as TSL timeframe? If takes 4 years starting from 2015 to build this little stn, then the construction cost will be very high. Trust me. Just in time for 1st or 2nd batch canberra bto residents.

    Like i posted on the other thread abt yishun hub (HDB 2020 & Frasers 2018).

  20. #110
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Mr. Shan said construction works will begin in 1Q15.

    https://www.facebook.com/k.shanmugam.page

  21. #111
    Join Date
    Nov 2011
    Posts
    270

    Default

    Quote Originally Posted by Pro888 View Post
    Mr. Shan said construction works will begin in 1Q15.

    https://www.facebook.com/k.shanmugam.page
    2019 too long lah, 48month to go, North Point city complete before NS12.

  22. #112
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by Pro888 View Post
    Tender to Design Development And Construction Of The Proposed Infrastructure Works At Jalan Sendudok/Canberra Link Area has just closed and will be awarded in August. Site clearance will begin roughly in Nov/Dec.

    Site ready for mrt civil works 1Q15
    Site ready for gls 2Q (unlikely) but most probably 3Q15 due to the construction of Canberra drive.

    Soon, very soon. They will announce, together with the neighbourhd ctr / shopping mall opposite.

    Tender process did show some urgency. Same goes to the ec plot. As i expected, reserve plot in April becomes confirmed plot in Aug.
    Bingo. Tender has been awarded on 1st day of Aug. Site clearance can be as early as next month.

  23. #113
    Join Date
    Jun 2012
    Posts
    25

  24. #114
    Join Date
    Jun 2012
    Posts
    25

    Default

    still no sign of site clearance.Will it happen in Dec ? ��

  25. #115
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by N12MRT View Post
    still no sign of site clearance.Will it happen in Dec ? ��
    Should start in Dec and not later, otherwise there will be a delay in handing over to LTA.

    Site clearance and earthworks - Dec to Mar/Apr
    Construction of mrt station mid2015

    If you have noticed, road widening at 1Canberra has already started (Tender condition for developer). 2 of the blocks only reached 8/9 storey and few months before hitting the top (Not TOP). Most of the time, road infrastructure works tied to the development will only carried out at the last stage (less ITHs).

  26. #116
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by Pro888 View Post
    Should start in Dec and not later, otherwise there will be a delay in handing over to LTA.

    Site clearance and earthworks - Dec to Mar/Apr
    Construction of mrt station mid2015

    If you have noticed, road widening at 1Canberra has already started (Tender condition for developer). 2 of the blocks only reached 8/9 storey and few months before hitting the top (Not TOP). Most of the time, road infrastructure works tied to the development will only carried out at the last stage (less ITHs).
    Feb already. Still now sign of site clearance but the tender for construction works for Canberra Stn has just closed today with 4 tenderers.

    http://www.lta.gov.sg/data/apps/tend...20Schedule.pdf

    There is also a tender for accredited checker for building works for the mixed development opp Canberra Stn. Probably HDB will launch it in May.

    Tender ref HDB000/15DPQ08

  27. #117
    Join Date
    Dec 2014
    Posts
    2

    Default

    how does the confirmation of Canberra Station affect CR in term of price??

  28. #118
    Join Date
    Sep 2014
    Posts
    650

    Default

    Quote Originally Posted by nikekill View Post
    how does the confirmation of Canberra Station affect CR in term of price??
    Up?

  29. #119
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    ulu price to non ulu price.

    demand up, rental up ---> ppty price up but also need to consider many other factors. Those super ulu one will gain the most.

  30. #120
    Join Date
    Aug 2011
    Posts
    1,342

    Default

    Quote Originally Posted by Pro888 View Post
    Feb already. Still now sign of site clearance but the tender for construction works for Canberra Stn has just closed today with 4 tenderers.

    http://www.lta.gov.sg/data/apps/tend...20Schedule.pdf

    There is also a tender for accredited checker for building works for the mixed development opp Canberra Stn. Probably HDB will launch it in May.

    Tender ref HDB000/15DPQ08
    Got it right again. Will be hot. Those taking mrt to work in the rush hour should have no worries of not able to board becoz it is a stop before the "bloated" Yishun stop. This one compared to new Yishun bto can potentially save up to a hour (to & fro) a day.

    http://esales.hdb.gov.sg/hdbvsf/eamp.../Sembawang.pdf

Similar Threads

  1. CityLife@Tampines EC awarded TOP
    By reporter2 in forum HDB, EC, commercial and industrial property discussion
    Replies: 0
    -: 17-02-16, 18:14
  2. Jurong West executive condo tender awarded to Koh Brothers-Heeton JV
    By princess_morbucks in forum HDB, EC, commercial and industrial property discussion
    Replies: 0
    -: 16-01-14, 08:51
  3. Replies: 298
    -: 12-08-13, 11:19
  4. Elias Road land parcel tender awarded to Elitist Development
    By reporter2 in forum Singapore Private Condominium Property Discussion and News
    Replies: 1
    -: 20-04-12, 03:02
  5. Jurong West landed plot not awarded
    By mr funny in forum Landed Property
    Replies: 5
    -: 23-03-08, 16:18

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •