Results 1 to 5 of 5

Thread: how long need to wait

  1. #1
    Join Date
    Jan 2009
    Posts
    11

    Default how long need to wait

    Anybody can advice if there is min occupation period before I can buy a condo after the resale HDB flat without any grant. Thanks.

  2. #2
    Join Date
    Jan 2009
    Posts
    11

    Default

    Quote Originally Posted by wadexu
    Anybody can advice if there is min occupation period before I can buy a condo after the resale HDB flat without any grant. Thanks.

    BTW, The resale HDB flat was in HDB concessionary interest rate loan

  3. #3
    Join Date
    Dec 2008
    Posts
    117

    Default

    Quote Originally Posted by wadexu
    Anybody can advice if there is min occupation period before I can buy a condo after the resale HDB flat without any grant. Thanks.
    Never take grant means can buy condo anytime.

    If take HDB loan then cannot sell HDB until 3 years up but still can buy condo anytime


    If take bank loan then can sell HDB after 1 year up.

  4. #4
    Join Date
    Jan 2009
    Posts
    11

    Default

    John, Thanks for your reply. So for my case with HDB loan, I have to live in the HDB flat for 3 years and rent out the private house within this 3 year's period. Am I right?

  5. #5
    Join Date
    Mar 2009
    Posts
    705

Similar Threads

  1. Replies: 0
    -: 13-02-20, 08:07
  2. He Love Durian so much. Don't wait so long like him.
    By Arcachon in forum Coffeeshop Talk
    Replies: 3
    -: 11-07-17, 11:13
  3. Long Hill's long wait for MRT station of its own
    By reporter2 in forum HDB, EC, commercial and industrial property discussion
    Replies: 0
    -: 13-03-15, 17:53
  4. Year-long wait over for EC buyers
    By orange in forum HDB, EC, commercial and industrial property discussion
    Replies: 0
    -: 01-10-14, 17:27
  5. Replies: 32
    -: 30-04-13, 16:52

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •