Results 1 to 5 of 5

Thread: how long need to wait

  1. #1
    Newbie

    User Info Menu

    Default how long need to wait

    Anybody can advice if there is min occupation period before I can buy a condo after the resale HDB flat without any grant. Thanks.

  2. #2
    Newbie

    User Info Menu

    Default

    Quote Originally Posted by wadexu
    Anybody can advice if there is min occupation period before I can buy a condo after the resale HDB flat without any grant. Thanks.

    BTW, The resale HDB flat was in HDB concessionary interest rate loan

  3. #3
    Newbie

    User Info Menu

    Default

    Quote Originally Posted by wadexu
    Anybody can advice if there is min occupation period before I can buy a condo after the resale HDB flat without any grant. Thanks.
    Never take grant means can buy condo anytime.

    If take HDB loan then cannot sell HDB until 3 years up but still can buy condo anytime


    If take bank loan then can sell HDB after 1 year up.

  4. #4
    Newbie

    User Info Menu

    Default

    John, Thanks for your reply. So for my case with HDB loan, I have to live in the HDB flat for 3 years and rent out the private house within this 3 year's period. Am I right?

  5. #5

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •